Bolina is now an Ecocoast company Ecocoast

À propos de nous

Bolina fabrique des barrages flottants depuis 20 ans et a installé une large gamme de ces types de produits partout dans le monde.

 

Bolina ingénierie conçoit et développe une large gamme de barrages flottants. Notre approche innovante apporte des solutions efficaces. Toute la gamme est développée au Royaume-Uni. Notre équipe a la compétence et l’expérience nécessaire pour garantir la livraison de votre projet dans les plus brefs délais et dans le budget.

  • 1998 1998
    timeline divider

    1998

    Bolina is formed after discussions between Jerry Row (Founder) and British Waterways regarding their need for river safety booms.

  • 2000 2000
    timeline divider

    2000

    First of over 400 Rope Safety Boom installations on the River Thames.

  • 2001 2001
    timeline divider

    2001

    Tees Barrage - Bolina's longest and most challenging site protecting the Tees Barrage from 1,000's of tonnes of debris with a PDB600.

  • 2004 2004
    timeline divider

    2004

    British Waterways were so impressed with the performance of the Tees Barrage boom compared with others that they had tried, that they added a further 80m long environmental boom to the Tees which remains there to this day.

  • 2007 2007
    timeline divider

    2007

    Maas 6 Boom in Holland paves the way for expansion into the Dutch market.

  • 2011 2011
    timeline divider

    2011

    Bolina Traffic Control Booms close off the River Rhine for President Obama at the NATO 60th Anniversary Summit in Strasburg.

  • 2014 2014
    timeline divider

    2014

    Cahorra Bassa - the first major LSB600 - 380m long Bolina boom replacing a failed competitors boom to protect the major hydro power installation in Africa.

  • 2015 2015
    timeline divider

    2015

    Kariba Dam - 250m of Bolina LSB600 in Zambia protecting the critical hydropower installation.

  • 2020 2020
    timeline divider

    2020

    Ecocoast acquires Bolina, giving clients unprecedented access to marine products globally.

  • 2021 2021
    timeline divider

    2021

    Europe's longest debris barrier! Installed by DEME in Belgium, to remove plastic from waterways.

"Bolina a toujours livré dans les délais et dans le budget prévu. Je les recommande sans hésiter."

P.C., Chef d’équipe, ENVIRONMENT AGENCY, Le Royaume-Uni